Contact

Send a transformer or substation inquiry

Provide the electrical ratings, application, destination, standard, quantity and available project documents.

Direct contact

Working hours: Monday–Friday, China Standard Time (UTC+8). Engineering replies to written inquiries with ratings and documents first.

What helps the review

  • Rated power and voltage ratio
  • Frequency, phases and vector group
  • Impedance, tapping and loss requirements
  • Installation environment and altitude
  • Applicable standards and test scope
  • Single-line diagram or technical specification

Not sure what to include? Read what a quotation needs.

Add Technical Details

Helpful attachments: single-line diagram, transformer specification, tender document, load profile, harmonic spectrum, site layout and cable-interface information.